Navigation
  • Home
  • Shop
  • Payment
  • Articles
Account
  • Sign In
Site logo
0
Cart: 0.00 $

No products in the cart.

  • Sign In
    Login Form

  • Home
  • Shop
  • Payment
  • Articles
20210106 135747 lightbox
lightbox
lightbox
lightbox
20210106 135747

Product Description

20201230 014439
Protect amulet B.E.2549 tiger ... 37.99 $
20210109 202411
Prorect amulet B.E.2558 LP Thu... 55.99 $

Charming amulet B.E.2551 Takrut Mee Sook Chai Rak Ying Long lead amulet by LP Ji (TAK83)

32.99 $

Charming amulet B.E.2551 Takrut Mee Sook Chai Rak Ying Long lead amulet by LP Ji

Email to a friend
Category: New Amulet Tags: charming amulet, money amulet, Takrut amulet, LP Ji
  • Facebook iconFacebook
  • Twitter iconTwitter
  • LINE iconLine
  • Description
  • Description

    Charming amulet B.E.2551 Takrut Mee Sook Chai Rak Ying Long lead amulet by LP Ji

    The best of powerful amulet of Metta and charming

    100% guarantee all time

    Name: B.E.2551 Takrut Mee Sook Chai Rak Ying Long lead amulet

    From: LP Ji, Wat Nongwha, Phetburi province

    Year of created: B.E.2551 (C.E.2008)

    Material of amulet: this powerful amulet created from lead.

    Size of amulet: 1 cm x 4 cm

    Ceremony: LP Ji created and properly blessed Takrut Mee Sook Chai Rak Ying Long lead amulet with special magic.

    Power: Takrut Mee Sook Chai Rak Ying Long lead amulet by LP Ji is the best of charming, attractive, kindness and Metta.

    Special: LP Ji wrote holy Yant on the sheet by himself to increase powerful. Moreover, there are 2 temple codes stamped on the Takrut.

    Biography of LP Ji:

    LP Ji was born on 24 July B.E.2507 (C.E.1964) at Phetburi province. LP Ji was ordained as Buddhist monk when he was 20 years old and went to study dharma, meditation and magic from LP Phaew of Wat Tanodluang, LP Yid of Wat Nongjok and other.

    If you are interesting amulet please contact us at thaisamulets@gmail.com

  • Phra Khun Paen
  • Phra Somdej
  • God amulet
  • New Amulet
  • Recommend Amulet
  • Bucha Amulet
  • Powder/Soil/Herb Amulet
  • Phra Kring Amulet
  • Phra Pidta Amulet
  • Coin and Monk Figure Amulet
  • Talisman and Guman
  • Other Amulet

Related Products

Quick View
LP Phaeo copper coin – Charoen Pon Som Phanthana (MON4)
Protect amulet LP Phaeo copper coin – Charoen Pon Som Phanthana (fulfill desire) batch
50.00 $ Read more
Quick View
Phra Somdej Taek Lai Nga holy powder amulet (SOM14)
Wealth amulet Phra Somdej Taek Lai Nga holy powder amulet – great wealth and luck batch
50.00 $ Add to cart
Sale
Quick View
Takrut Lokkha That with Lek Lai Kaew, Lek Lai Suriyathep and Gold Lek Lai (TAK2)
Rare amulet Takrut Lokkha That with Lek Lai Kaew, Lek Lai Suriyathep and Gold Lek Lai
200.00 $ 160.00 $ Add to cart
Quick View
Set of Lek Lai Intha Racha and Golden Lek Lai (TAK3)
Valuable collection Set of Lek Lai Intha Racha and Golden Lek Lai – Do not miss
100.00 $ Add to cart
  • Facebook iconFacebook
  • Twitter iconTwitter
  • LINE iconLine
© 2021 Thaisamulets. All Rights Reserved.
Telephone: +6661-768-0201 / Email: thaisamulets@gmail.com

Search engine

Use this form to find things you need on this site